The Southside Green Infrastructure Design Charrette produced some amazing imagery and vision for the S. 21st Street corridor. Â Please take some time to click on and browse the designs below, and provide feedback as you see fit. Â Overall, there was over $100,000 worth of in-kind design and consulting services, done over just a three day period, to produce the stunning end results below. Â We’re excited to take these designs to the next step.
Design Team 1 (Study Area A)
S. 21st Street, North of Carson to Southside Riverfront Park
Design Team 2 (Study Area A)
S. 21st Street, North of Carson to Southside Riverfront Park
Design Team 3 (Study Area B)
S. 21st Street, South of Carson to Josephine Street
Design Team 4 (Study Area B)
S. 21st Street, South of Carson to Josephine Street
Design Team 5 (Study Area C)
Southside Slopes Park Area
Design Team 6 (Study Area C)
Southside Slopes Park Area