Browse Designs

The Southside Green Infrastructure Design Charrette produced some amazing imagery and vision for the S. 21st Street corridor.  Please take some time to click on and browse the designs below, and provide feedback as you see fit.  Overall, there was over $100,000 worth of in-kind design and consulting services, done over just a three day period, to produce the stunning end results below.  We’re excited to take these designs to the next step.

 

Design Team 1 (Study Area A)
S. 21st Street, North of Carson to Southside Riverfront Park

Design Team 2 (Study Area A)
S. 21st Street, North of Carson to Southside Riverfront Park

Design Team 3 (Study Area B)
S. 21st Street, South of Carson to Josephine Street

Design Team 4 (Study Area B)
S. 21st Street, South of Carson to Josephine Street

Design Team 5 (Study Area C)
Southside Slopes Park Area

Design Team 6 (Study Area C)
Southside Slopes Park Area